Windsor Road Improvements
Project Limits:
Boulder Drive to High Cross Road (Illinois Route 130)
Project Description:
The proposed improvements consist of reconstructing Windsor Road from two to four and five lanes with raised median, hot-mix asphalt widening and resurfacing, concrete curbs and gutters, storm sewers, roadway lighting, pavement markings and other miscellaneous improvements. A new traffic signal will be installed at the Myra Ridge Drive and Windsor Road intersection. The project also includes the reconstruction of the multi-use path from Myra Ridge Drive to Stone Creek Boulevard on the north side of the road. A new multi-use path will be constructed on the north side of the road from Boulder Drive to Myra Ridge Drive and from Stone Creek Boulevard to High Cross Road; thereby, providing a continuous multi-use path along the entire north side of the project. Additionally, a new sidewalk will be installed on the south side of the road from Myra Ridge Drive to Susan Stone Drive adjacent to the existing residential lots.
Project Details:
Click here for project details.
Construction Information:
Click here for project construction information.
Project Updates:
| Type | File | Size |
|---|---|---|
| Project Info Sheet | 70KB | |
| Overall Plan | 469KB |