HOT TOPICS

Notices & Alerts

U-Cycle Brochure Survey

Date: 
January 26, 2018 - 5:00pm

U-cycle logoThe City of Urbana U-Cycle program would like to get your input on the U-Cycle brochure.

The purpose of this survey is to give U-Cycle a better understanding on ways to improve our written communications to our residents in future brochures and outreach materials.

Please view the brochure

You may go to the survey by using the following link: https://www.urbanaillinois.us/U-Cycle-Brochure-Survey

Your participation is greatly appreciated!

Cottage Grove Avenue Closure

Date: 
November 6, 2017 - 8:30am to November 7, 2017 - 2:30pm

As part of annual tree pruning, and weather permitting, The City Arbor Division will be closing the following streets:

  • Cottage Grove Avenue between Green Street and East Washington Street will be closed completely to all traffic from Monday, November 6, 2017 through Tuesday, November 7, 2017 from 8:30 a.m. through 2:30 p.m. daily.
  • Cottage Grove Avenue between Washington Street and Oregon Street and Cottage Grove Avenue between Main Street and Green Street will be closed to thru traffic from Monday, November 6, 2017 through Tuesday, November 7, 2017 from 8:30 a.m. through 2:30 p.m. daily.

Access to all driveways and properties will be maintained throughout the pruning.

A detour route utilizing Glover Avenue will be marked to route traffic around the work zone.

Motorists are encouraged to drive carefully through this and all work areas. Thank you for your cooperation while this pruning is in progress.

Vine Street Road Closure

Date: 
October 26, 2017 - 9:00am to 7:00pm

For today only (Thursday, October 26, 2017), Vine Street from north of Main Street to south of University Avenue will be closed from 9:00 a.m. to 7:00 p.m. for pavement resurfacing, weather permitting. The Vine Street and Main Street intersection will be closed periodically throughout the day. During the closure of the intersection, flaggers will be present to direct traffic around the intersection.

Motorists can expect delays and should allow extra time for trips through this area. Alternate routes should be considered, when feasible, to avoid the work area. Drivers should pay close attention the changing conditions and signs in the work zone, obey posted speed limits, refrain from the use of mobile devices, follow direction from flaggers in the area and be alert for workers and equipment in and around the work zone.

More information about the Vine Street Resurfacing Project can be found on the City website at http://www.urbanaillinois.us/node/6772.

We appreciate the patience and cooperation of the public during the construction of this project.

Public Hearing of the Urbana City Council October 23, 2017 - 7:00pm

Date: 
October 23, 2017 - 7:00pm

The Urbana City Council will hold a public hearing at 7:00 p.m. on Monday, October 23, 2017, in the Urbana City Council Chambers, 400 South Vine Street, Urbana, Illinois, to receive public input concerning a proposed amendment to an annexation agreement between the City of Urbana and Wendl, Inc. This annexation agreement was approved on March 24, 2005, pursuant to Ordinance No. 2005-03-036, for tracts of land generally located at 1901 S. High Cross Road and currently owned by Charles L. Wendling and Riggs Land Holdings, LLC.

Vine Street Road Closure

Date: 
October 23, 2017 - 9:00am to October 27, 2017 - 3:00pm

Vine Street from north of Main Street to south of University Avenue will be closed from 9:00 a.m. to 3:00 p.m., each day, for milling and pavement resurfacing, starting October 23, 2017 and ending October 27, 2017 weather permitting. The Vine Street and Main Street intersection will be open to traffic at all times.

Motorists can expect delays and should allow extra time for trips through this area. Alternate routes should be considered, when feasible, to avoid the work area. Drivers should pay close attention to changed conditions and signs in the work zone, obey the posted speed limits, refrain from using mobile devices and be on the alert for workers and equipment.

Further information about the Vine Street Resurfacing Project can be found at http://www.urbanaillinois.us/node/6772.

We appreciate the patience and cooperation of the public during construction of this project.

2017 Sewer Lining Project

Date: 
October 19, 2017 - 8:00am to November 3, 2017 - 5:00pm

The City of Urbana is lining more than 7,000 lineal feet of storm and sanitary sewer pipe to improve the integrity of both sewer systems. Beginning Thursday, October 19, 2017, Visu-Sewer of Missouri, LLC will be performing sewer cleaning and lining at various locations in Urbana. This work is expected to be completed by Friday, November 3, 2017.

The cured-in-place pipe lining process uses trenchless sewer construction technology that allows for the elimination of time consuming, expensive, and disruptive open excavations. The cured-in-place process provides for the insertion of a special liner inside the existing pipe in lieu of digging up and replacing the old pipe. The new liner creates a watertight, smooth-surfaced, structurally sound, and long-lasting pipe within the existing sewer.

Maps of the areas affected by sewer cleaning and televising are available at: http://www.urbanaillinois.us/node/6642

Cottage Grove Avenue Closure

Date: 
October 23, 2017 - 8:00am to October 27, 2017 - 2:00pm

As part of annual tree pruning, and weather permitting, The City Arbor Division will close Cottage Grove Avenue between Illinois Street and Green Street completely to all traffic from Monday, October 23, 2017 through Friday, October 27, 2017 from 8:00 a.m. through 2:00 p.m. daily.

Cottage Grove between Washington Street and Main Street will be closed to thru traffic from Monday, October 23, 2017 through Friday, October 27, 2017 from 8:00 a.m. through 2:00 p.m. daily.

Access to all driveways and properties will be maintained throughout the pruning. A detour route utilizing Glover Avenue will be marked to route traffic around the work zone.

Motorists are encouraged to drive carefully through this and all work areas. Thank you for your cooperation while this pruning is in progress.

Closed: Request for Proposals: 2018-19 Pavement Coring Services

Date: 
October 27, 2017 - 1:55pm

CLOSED

Pavement Coring will be received by the City of Urbana at the office of the Director of Public Works, 706 South Glover, Urbana, Illinois 61802 until 1:55 P.M. prevailing time on Friday, October 27, 2017 and publicly opened and read aloud at 2:00 P.M. at said office.

The Proposal Documents may be examined and copies obtained at the office of the Director of Public Works, 706 South Glover Avenue, Urbana, Illinois 61802.

All consultants are required to provide experience statements or other prequalification documents to show satisfactory evidence of the consultant’s competency to perform the proposed work at the time the Contract Documents and Specifications are requested or picked up.

This contract will be awarded to the lowest responsive and responsible consultant considering conformity with the terms and conditions established by the City of Urbana in the proposal and contract documents. The City of Urbana reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

North Lincoln Avenue Night Work

Date: 
October 9, 2017 - 7:00pm to October 27, 2017 - 6:00am

Night work to install improvements to Lincoln Avenue from south of Killarney Street to Saline Court will start October 9, 2017, and end October 27, 2017, weather permitting. The expected night work timeframe is from 7:00 p.m. to 6:00 a.m., Monday through Friday.

Motorists can expect delays and should allow extra time for trips through this area. Alternate routes should be considered, when feasible, to avoid the work area. Drivers are urged to pay close attention to changed conditions and signs in the work zone, obey the posted speed limits, refrain from using mobile devices, and be on the alert for workers and equipment.

Further information about the North Lincoln Avenue Resurfacing Project can be found at http://www.urbanaillinois.us/node/6623.

We appreciate the patience and cooperation of the pubic during construction of this project.

Water Street Closure for Blag Dog October Festival

Date: 
October 6, 2017 - 5:00pm to October 7, 2017 - 10:00pm

On Friday, October 6, 2017 at 5:00 p.m. through Saturday October 7, 2017 until 10:00 p.m., Water Street from Broadway Avenue to the West side of the Black Dog Smoke & Ale House building will be closed for the Black Dog October Festival.

Access to City Parking Lots 1 and 2 as well as access to remaining businesses will be available on Water Street from Race Street.

We appreciate your patience while this event is underway.

Green Street Temporary Closure

Date: 
October 3, 2017 - 7:00am to October 13, 2017 - 5:00pm

Due to weather constraints, the closure of Green Street from Goodwin Avenue to Lincoln Avenue to through traffic has been extended to 5:00 p.m., Friday, October 13, 2017, to allow for the repair of a steam tunnel.

Eastbound and westbound Green Street traffic will use a marked detour route via Springfield Avenue. Northbound and southbound traffic will be maintained at all times at the Mathews Avenue, Goodwin Avenue, and Lincoln Avenue intersections with Green Street.

Pedestrian and bicycle traffic will be routed into the street within an area protected from the active work zone. Access to Gregory Street and the parking lots east of Loomis Laboratory of Physics will be available from Lincoln Avenue via Green Street.

We appreciate the patience and cooperation of the public during construction of this project.

Further information about this project can be found at http://www.urbanaillinois.us/MCOREProject1