HOT TOPICS

Department Posts

CLOSED Request For Proposals - Facility Electrical Services

Date: 
August 12, 2011 - 2:00pm

Proposals will be received at the Office of the Director of Public Works, City of Urbana, Illinois, for:

RFP #1112-01 FACILITY ELECTRICAL SERVICES

Specifications may be obtained from the Office of the Director of Public Works, 706 South Glover Avenue, Urbana, Illinois, 61802.

Proposals will be received through 2:00 pm Friday, August 12, 2011, and at said time the proposals shall be opened and read publicly.

The City reserves the right to reject any or all proposals, and to waive irregularities or technicalities.

Advertisement for Bids 2011 - Sewer Lining Project

Date: 
July 6, 2011 - 2:00pm

Sealed BIDS will be received until 2:00 P.M. prevailing time on JULY 6, 2011 and opened and read aloud publicly at 2:02 P.M. prevailing time on JULY 6, 2011 at the office of the City Engineer, 706 South Glover, Urbana, Illinois, 61802 for the 2011 Sewer Lining Project (City Section 10-00500-00 -SR) furnishing of all materials, equipment and labor necessary for the cured-in-place full-length lining of approximately 7,154 feet of 8-inch and 1,281 feet of  12-inch sanitary sewer.


The bid will also include an additive alternative for 1,769 feet of 8-inch cured-in-place full-length sanitary sewer lining.

Advertisement for Bids: Urbana Section - UC2B Infrastructure Installation

Date: 
June 21, 2011 - 2:00pm

Sealed BIDS will be received until 2:00 P.M. prevailing time on JUNE 21, 2011 and opened and read aloud publicly at 2:00 P.M. prevailing time on JUNE 21, 2011 at the office of the UIUC Facilities and Services 1501 South Oak Street, Champaign, IL 61820 for the furnishing of all materials, equipment and labor necessary for the URBANA SECTION - UC2B INFRASTRUCTURE INSTALLATION. The project includes construction of a new fiber optic backbone network and Fiber-To-The-Premise (FTTP) distribution network in various parts of the City of Urbana, Somer Township and Urbana Township.The conduit for the fiber optic cable shall be installed by horizontal directional drilling methods with limited open cut allowed for handholes, splices, and limited plowing in cultivated areas.


See advertisement for bids attachment for additional information.