HOT TOPICS

Department Posts

Illinois Street Closure

Date: 
October 2, 2014 - 5:00pm

Illinois Street from Goodwin Avenue to Gregory Street will be closed to thru traffic from 7:00 a.m. on Wednesday, October 1, 2014 to 5:00 p.m. on Thursday, October 2, 2014 for Custom Service Crane, Inc. to set up and use a boom crane for work at Krannert Center, 500 South Goodwin Avenue. Portions of the adjacent sidewalk will also be closed to pedestrians. There will be no detour.


We apologize for any inconvenience this may cause.

Race Street Lane Closures

Date: 
October 17, 2014 - 5:00pm

Periodic lane closures will be expected along Race Street from California Avenue to Elm Street starting at 7:00 a.m. on Monday, September 29, 2014. Two-way traffic will be maintained on Race Street at all times. The project consists of milling and resurfacing pavement, concrete pavement patching, curb and gutter removal and replacement, sidewalk ramp removal and replacement, pavement marking, and other miscellaneous work.


The project is expected to be complete by October 17, 2014. Your patience is appreciated while this work is underway.


Further information about this project can be found at http://urbanaillinois.us/projects/2014-mft-resurfacing-project

Race Street Closure

Date: 
October 30, 2014 - 5:00pm

The north leg of Race Street between Windsor Road and south of Whitehall Court will be fully closed to through traffic beginning 7:00 a.m. on Monday, September 29, 2014 until further notice. Access to Stone Creek Church and residences on Race Street and White Hall Court will be available by using Race Street via McHenry Drive or Florida Avenue.


The south leg of Race Street at Windsor Road and the east and west legs of Windsor Road at Race Street will remain open to traffic.


Further information about the Windsor Road Pavement Reconstruction Project can be found on the City website at http://urbanaillinois.us/projects/windsor-road-pavement-reconstruction-project


Your patience is appreciated while this work is underway.

2014 Sewer Lining Project

Date: 
October 10, 2014 - 5:00pm

The City of Urbana is upgrading 11,500 lineal feet of sewer pipe to maintain the integrity of the sanitary and storm sewer systems in the city. Beginning Monday, September 22, 2014 through Friday, October 10, 2014, weather permitting, Hoerr Construction, Inc. from Peoria, Illinois will be performing sewer lining at various locations around Urbana. You will be notified via a door hanger brochure if the sanitary or storm sewer that serves your house is being lined.


This sewer lining process relies on trenchless sewer reconstruction technology that does not involve time consuming, expensive, and disruptive open excavations. Instead of digging up and replacing the old pipe, the cured-in-place process provides for the insertion of a special lining inside the old pipe. The new liner creates a watertight, smooth-surfaced and long-lasting pipe within the old sewer.


Maps of the areas affected by sewer lining are available on the City’s website at http://urbanaillinois.us/projects/2014-sewer-lining-project.