HOT TOPICS

Get Solar Energy

Solar Installation Checklist

Usually Performed By

Item

Owner/Installer

Determine if your roof gets enough sun with Google App

Owner

Review consumer protection guidance

Owner/Installer

Review Zoning Rules in Section XIII-9 (pages 276-278) of the City Zoning Ordinance*

Owner

Consider bids from “qualified person(s)

Installer

Apply for building permit and electrical permit.  Building Permit: $6 per $1,000 of the estimated costs for the project, minimum $50.  Electrical Permit: $6 per $1,000 of the estimated costs for the project, minimum $50.  (217) 384-2443  Complete applications are typically reviewed within three business days.

Owner/Installer

Apply for Ameren Net Metering

Owner/Installer

Apply for Ameren Distributed Generation

Installer

Request Building Safety Inspection (217) 384-2443

Installer

Submit an Ameren Certificate of Completion

Installer

Submit an Ameren Installer Certification

*The City of Urbana passed the Solar Energy System Text Amendment (Ordinance No. 2022-05-18) which permits solar farms – large-scale solar energy systems that produce electricity for sale to the grid – in many zoning districts as a special use. Solar arrays – small-scale solar energy systems that produce electricity for a nearby use or structure – are permitted as accessory structures in all zoning districts. Please direct zoning-related questions to the Planning Division at Planning@urbanaillinois.us or 217-384-2440.

Click on location marker to view address.
Contact Reference: 
- Last Modified -December 15, 2022 - 1:13pm